See the whole arrangement
Look at the proportions, the layout and how the different elements sit together.
Making & installation
Detailed drawings, a clear specification and the chance to see your furniture assembled before finishing: each stage helps you understand what is being made for you. Here is what happens from confirming your commission to installation and the settling-in visit afterwards.
The exact programme depends on your project and any building work. These are the main stages we work through together.
A deposit, generally around 10%, confirms the commission and secures the workshop slot before we develop the detailed proposal.
We prepare detailed drawings, an in-depth specification and a payment schedule. The specification describes each elevation, materials, colours and agreed fittings.
After specification sign-off and the pre-build payment, we take final measurements and check for changes arising from building work before preparing workshop drawings and cutting lists.
We order materials and manufacture in our workshop, assembling everything we practically can in the arrangement intended for your home.
We invite you to explore your assembled furniture before it goes to the spray shop. Open doors, try pull-outs and check the details together with us.
We apply the agreed workshop finish, then label and blanket-wrap the furniture for delivery. Our fitter installs it, with us on site at the start and checking progress.
Our assembly workshop gives us the space to put together everything we practically can, in its intended arrangement. Your viewing takes place before finishing, so you can see your own furniture taking shape.
Look at the proportions, the layout and how the different elements sit together.
Open doors and drawers, operate pull-outs and check the storage you have chosen.
Raise anything you notice before finishing. We can review possible alterations and explain any effect on cost or timing.
We coordinate the fitting requirements with you and your builder. Agree these practical details before delivery.
For kitchens, we attend stone-worktop templating and return after the worktops are installed for final adjustments and finishing. The interval between templating and fitting is normally around a week, depending on the project and supplier’s schedule. Bedrooms and other fitted furniture generally have a shorter installation process.
A follow-up around six weeks after installation. After initial sign-off, you have time to use your furniture in everyday life. We arrange a return visit to check for settling and fine-tune doors or fittings where needed.
We take a deposit, generally around 10%, to confirm the commission and secure a workshop slot. We then develop the more detailed drawings and specification, together with the payment schedule.
The specification is signed before we move into the pre-build stage. Following the pre-build payment, we double-check the final measurements, prepare workshop drawings and cutting lists, and move into ordering and manufacture.
It explains the proposed furniture elevation by elevation, including carcass and main materials, colours, finishes and fittings. Where relevant, it also identifies items such as the sink, taps and drawer-runner brand.
Read this alongside the drawings and payment schedule. It is the opportunity to check that the agreed details are clearly recorded before manufacture.
We liaise with builders, plumbers and electricians about the requirements of the furniture, including socket positions and where services need to go. We can also recommend trades.
We do not manage the overall building project or carry out the specialist plumbing and electrical work ourselves. We coordinate our installation requirements with you and your builder so the room is ready for fitting.
Building work can change a room. Walls may be adjusted, or removing existing fittings may uncover something that affects the design.
Before manufacture, we check the measurements and review anything that has changed so the workshop drawings reflect the space we will be fitting into.
Yes. We assemble everything we practically can in our assembly workshop, standing it in the arrangement it will have in your home. Before it goes for finishing, we invite you to come and look around it.
You can open the doors, try the pull-outs and check that the features you expected are there. This is a chance to experience your own furniture before it arrives on site.
If something needs attention or you would like to discuss an alteration, raise it with us at the viewing. Where a change is practical, it is usually easier to deal with before finishing than once the furniture is installed.
By this stage the furniture has been made to the agreed specification. We will review what an alteration involves and discuss any effect on cost or timing before proceeding.
Depending on your specification, we apply a lacquer or a factory-sprayed finish in the workshop. For hand-painted furniture, we apply primer and the first topcoat, with a hand painter completing the finish on site.
After finishing, the furniture is labelled and wrapped in blankets for delivery. We do not fully reassemble it again in the workshop after the finishing stage.
Our fitter carries out the installation. We are there for the first day or so to set out the job, check where everything belongs and go through the details with the fitter.
We return at intervals to check progress, normally including a check around the middle of the installation. For kitchens, we also attend worktop templating to go through the details with the worktop supplier.
We need a clear room, space to work and access for unloading as close to the property as practical. Existing furniture or the old kitchen should be removed unless you have specifically agreed removal with us.
Plumbing and electrical services should be prepared in the agreed positions. Final connections may need to follow fitting where services pass through cabinetry. We require flooring to extend right through to the walls, rather than stopping at the front of the units; agree the preparation sequence with us and your builder.
Stone worktops are templated once the relevant cabinetry is installed and ready. We arrange this as early as the job allows and attend to go through the details with the worktop supplier.
There is normally about a week between templating and worktop installation, although the timing depends on the job and the supplier’s schedule. Your kitchen installation therefore happens in stages, with final adjustments and any remaining finishing work following the worktops.
They generally are, because they do not usually involve the separate stone-worktop templating and fitting stages of a kitchen. The time needed still depends on the size and complexity of the furniture.
We continue to check the installation and deal with final adjustments before sign-off.
Once installation and any worktops are complete, we return for final adjustments, touch-ups or completion of the hand-painted finish, as applicable. We then go through the finished work with you for initial sign-off.
We also arrange a follow-up around six weeks after installation to check anything that has settled and make final adjustments where needed. Using the furniture day to day can reveal a door or fitting that needs a little fine-tuning. Let us know if anything needs attention in the meantime.
Tell us about your room, your plans and any building work involved. We can talk through how the furniture design, manufacture and fitting will fit into your project.
Discuss your project